Port Headland

Monadelphous Twin Boom Stacker Tripper & Elevator Replacement

Twin Boom Stacker used to stockpile ‘dry salt’ at Dampier Salt Limited’s port site.

Type:
SMP supply & installation
Status:
Duration:
3+ months

Scope

Replace the tripper, elevator, and bogie structures and all auxiliary parts with new items:

  • Analysis and interpretation of structural engineer report and design review
  • Review and incorporation of site inspection, survey checks, and design drafting support to fabricate the replacement assemblies
  • Complete supply, fabrication, and assembly of the tripper and elevator sections
  • Delivery to site of all fabricated assemblies

The new Twin Boom Stacker will be reused to stockpile ‘dry salt’ at Dampier Salt Limited’s port site, ready for ship loading.