Adaman Resources Kirkalocka Gold Mine Mount Magnet

Ensuring safe use of the ROM and surge bins and trommel frame.

Type:
SMP supply & installation
Status:
Duration:
12+ months

Scope

Remedial works for existing plant infrastructure to ensure safe use of the ROM and surge bins and trommel frame:

  • Analysis and interpretation of structural engineer report for condition of bins and supporting steelwork
  • Confirmation of required repair work programme to ensure safe use of working equipment
  • Fabrication of design-engineered solutions
  • Dedicated rotation team for installation onsite

Milestones

  • Grizzly frame and ROM bin upgrades
  • Surge bin upgrades
  • Trommel frame upgrades