Scope
Remedial works for existing plant infrastructure to ensure safe use of the ROM and surge bins and trommel frame:
- Analysis and interpretation of structural engineer report for condition of bins and supporting steelwork
- Confirmation of required repair work programme to ensure safe use of working equipment
- Fabrication of design-engineered solutions
- Dedicated rotation team for installation onsite
Milestones
- Grizzly frame and ROM bin upgrades
- Surge bin upgrades
- Trommel frame upgrades